Thermo-modernization of the Health Center and Municipal Social Assistance Center in Stegna


We have completed the thermo-modernization of the buildings of the Health Center and GOPS in Stegna. The following works were carried out as part of the thermo-modernization project:
• wall and roof insulation
• basement ceiling insulation
• attic floor insulation
• window and door replacement
Standard panel radiators were installed in both communal buildings. Piping systems were made of steel pipes connected to compression fittings. Thermostatic valves with heads are mounted on the radiators. The heating medium is water prepared in 2 heating centers with a cascade of ground heat pumps.
By replacing the boiler with ground-source heat pumps, the emission of pollutants generated by the heat source to the environment was eliminated, and the operation and operation of the heat source became easier. Two heat pump units with automation were installed, and the bottom source is 6 probes, 100 m each. Replacing old internal lighting with new LED lighting will reduce energy costs. Replacing old internal lighting with new LED lighting will reduce energy costs.

In the picture below – borehole probe borehole